Office Cabin - Mezzanine work using MS Tubular Structures & Covering the Wall Using 50mm Puff Panels (Wall Panels)

Office Cabin - Mezzanine work (Wall Panels)



Mezzanine Floor - Structural Frame work

Staircase Work - Setting



First floor Setting Work - Structural

Fixing up of Floor Panels 



Fixing up of wall panels 








 

40 mm thick - Flush doors - covering both sides with Mica.




40 mm thick - Flush doors - covering both sides with Mica.




             

















 

Fabrication and Erection of Kiosk - using Tubular Pipes and Cover over four sides using 8 mm thick Visaka HD Cement Fibre Boards along with 50mm x 25 mm GI Channel as Supports for Dry Wall Partitions & Flooring using 16 mm Visaka Heavy duty Boards

Fabrication and Erection of Kiosk - using Tubular Pipes and Cover over four sides using 8 mm thick Visaka HD Cement Fibre Boards along with 50mm x 25 mm GI Channel as Supports for Dry Wall Partitions & Flooring using 16 mm Visaka Heavy duty Boards





GI Channel with 8 mm thick Visaka HD Boards - Rolling Shutters - PPGL Sheets







Base Grid -Setting Work - Kiosk 1






610 mm x 610 mm c/c Grid frame Setting for Base supports



16 mm Visaka Heavy Duty Boards are used for Flooring @ Kiosk









 

Fabriction and fixing up of MS Gate using Tubular Pipes along with 4mm thick CNC - cutting designed Plates.

Fabriction and fixing up of MS Gate using RHS-Tubular Pipes along with 4mm thick CNC - cutting designed Plates.














 